Hayward Base Station AQL2-BASE-RF required if using AQL2-SS-RF
The AQL2-BASE-RF base station must be installed if the AQL2-SS-RF or AQL2-POD will be used. To install
the base station, remove the knockout on the upper left side of the OnCommand main control unit, insert the base
station, and then tighten the nut from the inside.
Included with ONCOM-ACT-RC
Joan F. –
Quality product
Juan J. –
Quality product